Loading

Our Design Process

  1. The first step in the process is to fill out the Project Information Form so that we know as much as we can about your project.
  2. We will work with you to create a Preliminary Design that includes color choices and details about the design.
  3. Determine the best possible foundation system based upon your location – If a Soils Report is available for your property we will need a copy.
  4. We will then provide you with a Quote that is good for 30 days.
  5. Upon Approval and receipt of the Design Deposit we will proceed with the final design.
  6. When the final design is completed we will provide you with a complete set of design drawings for submittal to the Building Official in your area.  This design will typically be submitted with the electrical and solar design that completes the design of the entire system.
  7. Upon approval by the Building Official we will request a Fabrication Deposit to begin building your kit.
  8. At this time the foundation may be constructed and we will help coordinate that work if needed.
  9. When the fabrication process is completed we will arrange for a specific delivery date and have your solar carport kit delivered at the proper time and place.
  10. If needed we will send a representative to either train your crew or to manage our crew during the installation, depending upon your preference.